Road closures and restrictions for Regimental Funeral Nov. 2, 2022

Burnaby, B.C.

2022-11-01 12:40 PDT

Motorists travelling through Richmond should expect significant road closures and restrictions in the area of the Richmond Olympic Oval for the Regimental Funeral of Constable Shaelyn Yang on November 2, 2022 from approximately 8 a.m. to 1:30 p.m.

Roadways on both sides of the Fraser River near the YVR South terminal will be affected.

This includes:

 Map showing traffic closures near Regimental Funeral Nov. 2, 2022 | Traffic control points: No. 2 Road/Ingles Drive, Russ Baker Way/Cessna Drive P2, Parade muster point @ BCIT Parking, Gilbert Road/Russ Baker Way, Gilbert Road/Dunsmire Bridge  Gilbert Road/Riverview Parkway, River Road/Pearson Way, Lansdowne Road/Hollybridge Way, River Road/Hollybridge Way, River Road/T&T Market Alley, River Road/ Oval Way, River Road/Brighouse Way, River Road/River Road

View larger image: Parade Route and Traffic Control Points (PDF)

Travellers are advised that the YVR South Terminal will still be accessible, but they should plan ahead for unexpected delays due to traffic congestion in the area.

Parking near Templeton SkyTrain Station may also be affected.


Released by:

BC RCMP
Media line: 778-290-2929

Follow Us:

Date modified: